yellowhead mining feasibility study

Yellowhead Mining Feasibility Study

Taseko Mines Gets A New Flagship Project Almost For Free ...

Dec 06, 2018 · Source: Yellowhead Mining The reserves should be sufficient to support a mining operation with a throughput rate of 70,000 tpd for 28 years. An average annual production of …

Harper Creek Project, Feasibility Study, The Yellowhead ...

Harper Creek Project, Feasibility Study, The Yellowhead Mining Company; Harper Creek Project, Feasibility Study, The Yellowhead Mining Company. For a feasibility study for a 70,000 t/d (tonnes per day) copper-processing facility, Allnorth provided multiple services, including: 1) flowsheet and process plant design and development that ...

Analyst Commentary: Yellowhead Mining Harper Creek Copper ...

Yellowhead Mining’s (TSXV:YMI) recently released Harper Creek Copper project feasibility study shows the potential for an economically robust copper mining operation based on long term average...

Yellowhead Mining - Energy and Mining Magazine

Vancouver-based Yellowhead Mining Inc. in March 2012 completed a feasibility study on the Harper Creek project, which was initially explored in the late 1960s/early 1970s.

yellowhead mining feasibility study - puntoalloggio.it

Harper Creek Project, Feasibility Study, The Yellowhead Mining Company Harper Creek Project, Feasibility Study, The Yellowhead Mining Company. For a feasibility study for a 70,000 t/d (tonnes per day) copperprocessing facility, Allnorth provided multiple services, including: 1) flowsheet and process plant design and development that

Taseko to buy out Yellowhead Mining - MINING.COM

Dec 04, 2018 · Yellowhead is the owner of the Harper Creek copper-gold-silver project about 90 km from Kamloops. A feasibility study was completed in 2013 outlining five phases of open pit mining …

Anthill Resources Ltd. - Yellowhead - Sun Oct 20, 2019

Yellowhead Mining plans to advance the Harper Creek Project through to production by completion of an environmental assessment report, permitting, detailed engineering and project financing. Environment Assessment. The Company and its consultants have been collecting a wide range of project-specific environmental baseline data.

Home | Taseko Mines Limited

Taseko is a mining company focused on the operation and development of mines in North America. Headquartered in Vancouver, Canada, Taseko is the owner (75%) and operator of the Gibraltar Mine, the second largest open pit copper-molybdenum mine in Canada.

Major Mines & Projects | Harper Creek (Yellowhead) Project

The Project consists of a combined electric and diesel powered open pit operation and a 70,000t/d conventional copper concentrator. The mineable reserves are estimated to be 704.4Mt with an average grade of 0.262% Cu, 0.029g/t Au and 1.14g/t Ag reported at a 0.14% Cu cutoff grade.

Yellowhead Mining Inc announces graduation to Toronto ...

Jun 08, 2012 · Feasibility Study results announced on March 2, 2012 showed a pre-tax NPV 8 of $749.7 million with an IRR of 20.2% based on long-term metal price projections of US$2.50/lb Cu, US$1,250/oz Au and ...

Taseko Mines to Acquire Stake in Yellowhead Mining for $15 ...

Taseko Mines to Acquire Stake in Yellowhead Mining for $15.1 Million. Published: December 6, 2018 | ... should be as well.Yellowhead’s project now has a path forward and with over $60 million having been spent on a Feasibility Study and Environment Plan to-date, we are excited to continue advancing the project towards production. ...

Yellowhead Releases Updated Feasibility Study for Harper ...

Yellowhead Mining Inc. (TSX:YMI) announced the results of an updated feasibility study for its British Columbia-based Harper Creek project, commenting that proven and probable mineral reserves come...

Yellowhead | Taseko Mines Limited

A 2014 Feasibility Study (1) proposed a 70,000 tonne-per-day open pit copper mine with a 28-year mine life. The Yellowhead project increases Taseko’s - pipeline of global reserves to approximately 7.5 billion pounds of contained copper.

Taseko buys BC copper project for $15m

The Yellowhead feasibility study envisions a 70 000 t/d concentrator at a total pre-production capital cost of about C$1-billion and an average operating cost of $1.46/lb of copper. Using $3/lb...

Last Article: Capacity Of Line Crushers   Next Article: Ball Mill Fineness Adjustment

Related articles:

2006-2020 © All rights reserved
Add: New Technical Industry Development Area, Zhengzhou, Henan, China. Postcode: 450001
E-mail: [email protected]